
How we work
Agents build. People sign.
Agents give you the speed. Named people own intent, architecture and each sign-off.
- You agree scope in writing before code exists
- A named architect signs the design
- A separate session reviews code and tests
- Release waits at a gate the agent cannot pass
Example record
Follow one change through
So you can see who closed each stage. The next one opens only after a name goes against it.
A failed sign-off sends the work back to the stage that caused it.
- Signed
Scope agreed in writing
you + our analyst
- Signed
Design before the build
our architect
- Signed
Work split into 30- to 60-minute units
our engineer
- In review
Code with its tests, reviewed separately
engineer + test lead
- Waiting
Release past the production gate
your release manager
- Next
Production watched against your thresholds
you, with the agent read-only
4 sign-offs, and who gives each
- S01
Agreed scope, in writing
We write business rules, checkable acceptance criteria, worked examples and an out-of-scope list. Gaps and contradictions come back to you as questions, before a plan exists.
You sign off, with our analyst
- S02
The design, before the build
Interfaces, data model, dependencies, constraints and the rejected alternatives, on paper. On an existing system it also names the behaviour that has to stay as it is.
Our architect signs off
- S03
Work you can follow
We split your change into units of 30 to 60 minutes. Each has its own finishing condition, so you see progress unit by unit.
Our engineer signs off
- S04
Working code, with its tests
Code, tests and a pull request from the same session. The tests are written from the acceptance criteria agreed at stage 01, not from the code, and a separate session and our test lead check them for the patterns that make a suite hollow. A unit without passing tests goes no further.
Our engineer and our test lead sign off
A failed sign-off sends the work back to the stage that caused it. Stages run in order.
After the last sign-off, the line closes into a loop
- S05
Release, behind a gate the agent cannot pass
An agent prepares the release, writes the changelog and triages the flaky test, sandboxed on credentials scoped to the job. It stops at a production gate enforced in the pipeline, and a refused attempt is logged with its reason.
Your release manager authorises
- S06
Production reports to a person
A deterministic script watches your metrics against your thresholds and calls the agent when one breaks. The agent diagnoses read-only, and its fix reaches you as a pull request at the same gate as on day 1.
You triage. A merge needs a name
A breached threshold becomes scope and re-enters at stage 01, behind the same 4 sign-offs. You lose the wait for a ticket and keep the approval.
6 stages that close into a loop
What production finds becomes your next scope. That return turns 6 stages into a loop.
Four sign-offs, each by a named person. You sign the scope and authorise the release. Our architect, engineer and test lead sign the rest. The last 2 stages run after the merge, and what stage 06 finds skips the ticket queue.
Reference
The loop Anthropic published, mapped stage by stage
Anthropic's AI-native SDLC playbook runs delivery as 6 stages in a loop, with people accountable at each gate. Ours is mapped to it stage by stage, on the model your contract allows.
In the playbook and here, what stage 06 finds goes back into stage 01 as scope.
The AI-native SDLC playbook, claude.com ↗Capabilities
What runs without a reminder
We put the guardrails in the agent's own loop, so they hold on each machine that clones the project. Their configuration is committed with the code.
Why review is a different session
The session that wrote the code defends its own decisions, wrong ones included. A separate session reviews it against the spec.
Review runs separately, from the spec and the change
It gets no account of how the code came to be
1 in 5 defects caught before merge is found only here
The expensive kind: violated requirements, unhandled edges, invented patterns
How we keep a session cheap
The context window is re-sent on each turn, so cost grows with session length. An overloaded context also degrades output, so the same discipline pays on both.
Model matched to the task class
1 task per session, clean context between unrelated tasks
A full repository sweep costs 25,000 to 50,000 tokens per question, so agents query the index instead
A turn and spend cap on each session, so a loop stops itself
A weekly baseline for the trends
Model
What we fix, and what you decide
What we fix
- F16 stages in order, each producing something a person reads
- F24 sign-offs, each with a named owner and a recorded trace
- F3The rules above are configured in your repository
- F41 agent per stage, its instructions versioned with your code
- F5A commit per step, reviewed by a different session
- F6The delivery baseline in place before agents are let in
What you decide
- C1Vendor, model and region, against your contract and regulator
- C2The enforcement point. We set the behaviour, you pick the mechanism
- C3Stack, branching model, test strategy, architectural style

Our own projects
We run this standard on our own work first
Agents do the implementation on our projects, under the same 4 sign-offs. The standard is published in full, so you can check us against it.
Your path in. Review, slice, team
- S01
Review. A readiness review
So you know what breaks first before you commit budget. Fixed scope, fixed price, each line written down with its price.
The assessment, a priced plan and the first move
- S02
Slice. One feature under the 4 sign-offs
So you see the process work on your pipeline before you scale it. One feature, delivered with the 4 sign-offs.
One feature in production, and your call to scale or stop
- S03
Team. Your backlog, 3 to 8 people
So your backlog moves the way the slice did. 3 to 8 people, with the 4 sign-offs in place from day 1.
Your backlog, shipped with the same sign-offs
Each step stands on its own, and you decide whether the next one follows. An audit can also start alone, scoped to a framework and an assessment date.
FAQ
The questions you were going to ask
Answered here, before anyone books a call.
Next step
Still a question we have not answered?
Ask it directly. You get a written answer before anyone books a call.



